The walkway between the garage and main cabin entrance are in place. Mike carefully selected large pieces of limestone as the base for each beam. The guys have also begun to frame in the garage. The stone masons, chinking guys, electrician, plumber, solar team...work was going on everywhere I looked. That's good news after all the weather delays of the late summer and early fall.
Window Wall and Walkway
The window wall has been installed between the dining area and screened porch. The five sections can accordion open all the way or function as a single door on the fireplace side. It will be stained to match the other wood. You can see it through the porch. Oh, how glorious it will be on days where the temperature invites the outside into the cabin through the large opening.