Frozen Mud



Sub-freezing temperatures for several weeks froze the ground, but a promised warming trend gave the crew a small window of opportunity to dig the trenches and hole to bury the conduit from the propane tank connecting both cabins and installing the septic tank.  Within a few days the solid ground will be a muddy mess.  While that was going on, another crew slid the duct work down the ladder into the basement/crawl space of the main cabin completing that installation. 

No comments: